Who Actually Turns Up: Closing the Distance Between the Pitch Team and the Delivery Team

Harman Dean
Who Actually Turns Up: Closing the Distance Between the Pitch Team and the Delivery Team

Most UK consultancy engagements begin with a meeting, not a document. A senior partner, a specialist and perhaps an analyst sit across the table, describe how they would approach the problem, and leave behind a proposal carrying their names and, frequently, their biographies. That proposal does a great deal of persuasive work. It is also, in a quiet way, a promise about attention: that these particular people will be the ones thinking about the client's problem.

The difficulty is that a proposal describes an intention, while a project produces a record. Between the two there is often a gap, and it is rarely the result of bad faith. It is the ordinary consequence of how advisory firms staff their work.

The two teams behind a single engagement

It helps to name the phenomenon plainly. There is a pitch team and there is a delivery team, and in a great many firms they overlap only at the edges.

The pitch team is senior, articulate and commercially fluent. Its members are chosen because they can hold a room and because their credentials reassure a buying committee. The delivery team is assembled later, once the contract is signed and the timetable is fixed. It may include one of the people from the pitch, often in a supervisory capacity, alongside colleagues the client has never met.

This is not inherently a problem. A firm that sends its most expensive people to every working session would be an expensive firm indeed, and clients would rightly question the fee. What matters is whether the arrangement is disclosed, agreed and visible as the work proceeds — or whether it emerges only when an unfamiliar name appears on a project plan in week four.

Why people change, and when the change is fair

Substitution happens for legitimate reasons. A named lead may fall ill, be promoted, leave the firm, or be pulled onto a matter the client cannot see. Behind these events sit commercial realities that no consultancy can fully insulate a client from.

What distinguishes an acceptable change from an unwelcome one is usually three things: whether it was raised early, whether the replacement is of comparable seniority and relevant experience, and whether the client was asked rather than told. A firm that telephones to explain a departure before the client notices it is behaving well. A firm that quietly reallocates the work and continues invoicing at the original rate is not.

Questions worth putting before signature

The most economical moment to address continuity is before the contract is executed, when the firm is still keen and the client still has leverage. Six questions cover most of the ground:

None of these questions is hostile. Put courteously, they signal a client who reads carefully — which tends to improve the quality of what follows.

Drafting substitution rights that are proportionate

A short schedule to the engagement letter can carry most of this. Name the key individuals. Require the firm to seek written approval before substituting anyone named, with approval not unreasonably withheld. Require a replacement of equal or greater seniority and comparable sector experience. Require a handover of an agreed duration at the firm's expense. And, where the named lead's involvement was central to the buying decision, reserve a right to revisit the fee if that involvement does not materialise.

Proportionality matters. A four-week diagnostic does not need the machinery of a multi-year outsourcing arrangement. But even a short brief benefits from one clear sentence identifying who is accountable and who will actually be present.

A delivery log: ten minutes that repay themselves

Once work begins, the client's project lead can keep a simple record at the end of each working session or call. Four columns are enough:

| Date | Activity | Person(s) present and role | Decisions or outputs |

Completed conscientiously, this log does several things at once. It verifies invoices against actual attendance. It reveals, without confrontation, whether the promised seniority is materialising. It gives the client concrete material for a reference conversation at close-out. And it protects the firm as much as the client, since a documented record of contribution is the best answer to a later dispute about value.

A midpoint review of the log is worthwhile. Are the named individuals appearing? Do the recorded hours resemble the proposal? Has anyone joined the team without explanation? A short conversation at that stage is far easier than a reckoning at the end.

Realistic expectations

No client should expect a consultancy to freeze its staffing for the duration of a project, and few firms could honour such a promise. The aim is not rigidity but transparency: named people who are genuinely involved at the moments that matter, changes that are raised rather than discovered, and a written record that both sides can rely on.

A name on a proposal is ultimately a statement about where attention will be directed. It is reasonable for a UK client to ask that statement to be made specific — and then to check, quietly and without drama, that the people in the room are the people who were promised.

All Articles

Related Articles

The Assurance Memo: Stress-Testing a Consultant’s Recommendation Without Duplicating the Work

The Assurance Memo: Stress-Testing a Consultant’s Recommendation Without Duplicating the Work

Before the Adviser Leaves: A Close-Out Discipline for UK Consultancy Projects

Before the Adviser Leaves: A Close-Out Discipline for UK Consultancy Projects

The Evidence of Place: Choosing a Setting for a Consultancy Diagnostic

The Evidence of Place: Choosing a Setting for a Consultancy Diagnostic